Star turn for Fiat 500x launch
- Details
The Star Events team worked to a brief from production company Lodestar. It required a complex rigging element throughout the venue and over 1,100sq.m of multi-level terracing, ramps and stairways to form the stage, an auditorium for 1,000 people, VIP and technical areas.
The whole set up was constructed on a sub-floor, laid not only to protect the Olympic standard sports surface, but to spread the significant loads generated by the event production, which included a small crane, squeezed into th