Oasis breaks i-Pix BB records
- Details
Gawler's original basic over-stage rig concept which started the tour in October 2008 utilised 30 BB4s, with six units rigged horizontally onto each of five steeply raked upstage/downstage 'finger' trusses. These were attached via custom brackets fabricated by lighting suppliers PRG, and are utilised to produce a general stage wash.
When the summer 2009 stadium shows appeared on the itinerary an extra finger truss was added over the stage, making six in total, along with another six integral BB4s now rigged in vertical pairs,