ArchWork solution for Bijlmerpark theatre
- Details
Lumen Solutions were approached to provide their technical expertise in designing and implementing a dynamic architectural installation for the theatre.
ArchWork fixtures were chosen due to their IP rated nature and proven durability in other installations throughout the Netherlands.
In total, 171 ArchWork Arcshine6 fixtures were used as linear wall washers, each featuring six 8W RGBW LEDs engineered specifically for outdoor installations.
The ArchWork ARCSHINE6 luminaires were selected due to their slim design, outstanding brightness levels and pixel controllable features allowing the theatre to project a wide array of colours, textures and media with no need for other fixtures.
(Jim Evans)