The final two shows of the 2021 UK leg were at the Birmingham Utility Arena and Glasgow’s SSE Hydro
UK - The Australian Pink Floyd Show’s 2021 UK tour played 28 shows across the country between October and December, most of the dates having been rescheduled from their 2020 slots. The final two shows of the 2021 UK leg were at the Birmingham Utility Arena and Glasgow’s SSE Hydro where ticket demand was so high that a large number of extra seats were sold at both venues.
As per previous UK TAPFS tours, the sound system was provided by Capital Sound, part of the Solotech UK Group. Also as previously, they deployed part of their Outline inventory for it, the standard system configuration through most of the dates being L/R main hangs of 14 Superfly and three Mantas 28 (as down-fills) plus side-hangs of two Superfly and six Mantas 28s each, with 12 GTO-SUBs and six LIPF-082 dedicated lip-fill speakers. The system was powered and controlled by Powersoft X8 amplifiers and Outline Newton processors.
FOH was manned once again by Trevor Gilligan, whose first use of Superfly was on the TAPFS UK tour in 2018. At the time he enthused, “This rig has reached a new level of live sound, from small rooms to large rooms it simply does its job. It’s very solid, great coverage, it creates an image that’s right in front of you. I am using much less left / right EQ and when we do a very big room and we take the volume level up it all goes up together - you never get the sub and hang difference that you can with other systems.”
Three years, many road miles and one pandemic later, has anything changed? “As far as tweaking things, just a bit more EQ I think, especially in the upper midrange but all in all Mark (Edwards, System Tech) does a blinding job setting it up and EQ-ing it, then I just use it and it's great.”
The strong ticket sales in Birmingham and Glasgow required a change of system to maintain the power and coverage needed for the much bigger rooms. At these venues Outline’s GTO C-12 was brought in for the main hangs while the Superfly moved to the sides and a further six GTO-SUBs were added.
Trevor continues, “When we used the bigger box it was very nice indeed, my mix was just the same but I didn’t have to push things as much and the low end of the box sounded easier. Also, we noticed that as you went between the Superfly outer hangs and the C-12 you couldn’t tell where one ended and the other began as it works so well together. It was just great and filled the Hydro in Glasgow easily.”
Tom Gardner was one of the PA techs on the show and he comments: “The Australian Pink Floyd Show has some critical needs - it needs a scalable system, the flown system has to be lightweight and the truck footprint needs to be as small as possible.
“The Superfly / Mantas system ticks all three boxes. A system comprising six GTO-SUBs, 32 Superfly, 18 Mantas and six lip-fills plus amps and trunks all fits into a 12 foot space on the truck. Also, the light weight of the boxes allows us to get eight Superfly and three Mantas on a single 500 kg point, enabling us to get maximum coverage within the weight limitations. Whether flying 11 or 17 boxes it’s incredibly quick and simple - the longest part of flying the box is hooking up the CA-COM connectors.”
Tom concludes, “The Superfly / Mantas combo dealt with the challenges of Aussie Floyd incredibly well, especially with a Newton processor and 12 Powersoft X8’s on the front end. Integration between the two devices worked fantastically well over Capital / Solotech’s Dante digital MTP infrastructure.”

Latest Issue. . .

Save
Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline