Embarking on his first North American tour in almost a decade, Peter Gabriel kicked off his ‘Growing Up Live’ 2002-2003 tour on 13 November with a stage production that has been termed "spectacular." Lighting designer Luc LaFortune (LD for Cirque du Soleil) has specified High End Systems equipment in the design, including 36 X.Spot HO (High Output) and 36 Studio Beam automated luminaires, as well as four Catalyst systems with orbital mirror heads and six Catalyst media servers. Controlling the show are three Wholehog II consoles with a wing.

The UK's Neg Earth is the primary lighting contractor, with Upstaging as its partner on the North American legs. The Neg Earth crew includes programmer/operator Dennis Gardner, crew chief John Shelly, head electrician Andy Porter, and Dave Cox in charge of Catalyst systems.

(Lee Baldock)


Latest Issue. . .

Save
Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline