UK - Richmond Theatre was built in 1899 as the Theatre Royal and Opera House. In June 2008 Maltbury were invited by Tim Foster architects to submit a proposal for the orchestra pit in-fill. This was part of a bigger project at the theatre and the deadline was very tight.

To simplify the changeover Maltbury strengthened the walls of the pit and created a load-bearing 'shelf' around the inside face. Decks were kept to a maximum of 2ft wide so they were easy to handle as they dropped into place on the ledge. No legs were needed. Maltbury also took on other specialist carpentry work on the site at short notice.

(Jim Evans)


Latest Issue. . .

Save
Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline