Czecho-Slovak SuperStar first aired in September during the Czecho-Slovak cultural exchange month and runs for 10 weeks.
Martin Professional LC Series LED panels and MAC moving heads make up the majority of a large dynamic lighting package with supply/sale through Martin's Slovak partner Adam A Syn.
The show stage is filled with approximately 300sq.m of LED panels with panels in the stage floor and various other LED spread around the set. But the most crucial visual aspect is projected on backdrop Martin LC Series LED panels via a Martin P3-100 System Controller.
The SuperStar setup includes seven independent optical channels supplied by three Martin Maxedia media servers controlled by a Martin Maxxyz controller.
(Jim Evans)