TeleStage Associates held an official opening of their new office and workshops in Bury St Edmunds on the 13 June. The new premises comprise 350sq.m of office space and 520sq.m of fabrication and warehousing space.

The expansion allows for future growth and provides room for the development of a fully-equipped electrical and electronic workshop which will facilitate the wiring of equipment racks for MCC’s audio-visual equipment racks and custom panels. The workshop will be used for the prototyping and testing of control systems used in stage rigging, AV and show control. A dedicated QA area will ensure that equipment meets all necessary standards before dispatch.

To mark the opening, the company demonstrated a number of items of stage equipment, including two scissor lifts (one using Serapid link chains and the other a single spiral drive from GALA), two of the new super-silent stage winches, operating under load to demonstrate their integral overload and slack rope detection systems. Two other stage hoists were also on display, together with a Batik/Guddland CAT computer control system.The company can now be found at 4 Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk, IP32 7AR. Tel: +441284 755512.


Latest Issue. . .

Save
Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline