Delstar Engineering kitted out the Palladium with a modular floor 15 years ago and was invited back again to enhance the engineering capabilities of the theatre for this fresh and exuberant show.
The installation includes a walkway and an arrangement of over 40 dedicated working winches that drive a variety of effects ranging from small flown pieces to heavy scenic walls. Delstar also installed a complex show deck, incorporating an inner and outer revolve that can raise and lower lifts while rotating as a central focus on stage.
The original cast recording album has just been released and the show is expected to run until at least December 2010.
(Jim Evans)