Rock'n'Heim satis&fyed with Nexo STM
- Details
satis&fy worked closely with Nexo to design the system, which required maximum cardioid sub efficiency to minimise spill to the second stage. It also needed to provide even coverage while controlling spill outside of the audience area.
The site itself came with a number of challenges for the team. The truss wasn't designed to support a flown sub system, and, because of video and photography sight lines, the subs could only be groundstacked 2-high.
System