Stage Electrics wins City Hub contract
- Details
This new building will offer students a modern facility including a large performance hall and drama studio, both of which will feature new lighting fixtures including the Chauvet Professional Ovation E-910FC and CYC 1 FC units.
Stage Electrics worked closely with both the main contractor Wates Construction and Nottingham College to develop a specification that was within budget and met all the technical requirements whilst utilising the colleges existing sound equipment. Work commenced on site in May and is anticipated to be completed in early August.