UK - Following a collaboration at the recently completed White Rose leisure extension in Leeds, Studiotech was approached by tensile fabric specialists, Base Structures, to assist with the multi-million pound transformation of the NEC in Birmingham.
Included in this transformation was the facelift of the façade. The new design included patterned coloured panels and 37 tensile fabric pyramids, designed by Base Structures. Each translucent pyramid was to be backlit to create a more attractive and engaging environment for all stakeholders.
Studiotech assisted Base Structures by providing the detailed design, supply, installation and programming of the feature lighting. They chose to use Traxon Washer Allegro RGB LED luminaires to wash gracefully behind the pyramids.
The complex façade design meant that a number of trades were involved in completing this facelift, co-ordination with one another was key to a successful installation.
The completed installation provides a striking addition to the NEC arena, creating a dynamic and impressive display at one of the UK’s most popular venues.
(Jim Evans)

Latest Issue. . .

Save
Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline