USA - When pop sensation Shakira needed some custom equipment for her Oral Fixation tour, Tomcat and Production Resource Group were all too happy to help with the project.

In all, Tomcat USA fabricated 30 custom light frames with each individual frame designed to hold six Par 64 short fixtures. When assembled, the wall is five frames tall and six frames wide with each column of frames supported independently. Each frame is approximately 87" long x 58" tall and 18" wide and arranged so that the fixtures would be on 29" centre through the entire wall. To make the system load-in and load-out more quickly, the design included locking over-centre latches to hold the frames together as they are assembled vertically. All of this equipment was powder coated flat black.

The Oral Fixation tour began its Stateside visit in El Paso, Texas at the beginning of August 2006. That leg of the tour continued for six weeks to sold out dates throughout the US and wrapped up in Hildago, Texas. The tour continues with stops in Mexico, Columbia, Chile and Argentina scheduled for late September/early October. The Columbian singer/songwriter is supporting her latest album, Oral Fixation Vol. 2, released in November 2005.

(Chris Henry)


Latest Issue. . .

Save
Cookies user preferences
We use cookies to ensure you to get the best experience on our website. If you decline the use of cookies, this website may not function as expected.
Accept all
Decline all
Analytics
Tools used to analyze the data to measure the effectiveness of a website and to understand how it works.
Google Analytics
Accept
Decline
Advertisement
If you accept, the ads on the page will be adapted to your preferences.
Google Ad
Accept
Decline