Tim Roffey of Unusual was given the task of finding a way of getting the bridge up to the 4th floor gallery. Although it couldn’t fit into the goods lift on the level, there was a possibility that it might fit in if loaded into diametrically opposed corners. A ground support was built inside the lift using mini-beam truss. Using manual lever hoists attached to the temporary grid, the exhibit was gently coaxed into position inside the lift - leaving no more than 20mm clearance by the lift doors.
(Lee Baldock)