Nine panels of Lighthouse LVP20 (20mm pixel pitch) screen have been installed. Regular maintenance is provided by Lighthouse, but at the BIC, there is no facility to do this from within the building so to cater for this, a special mounting structure allows the screen to be hinged forward for maintenance work. The screen also has the ability to show two independently-controllable images on the screen at any one time. This is currently being used to show video images on 90 percent of the screen, with the lower 10 per cent displaying ‘live’ text messages about events at BIC.
(Ruth Rossington)